TRANSMISSION CONTROL ยท 420 KV NETWORK
Generation Load Substation Line above 85%
50.012 Hz
Redispatch of 180 MW from Rjukan to Kvinnherad clears the Aurland constraint at a cost of 7,400 EUR for the period.